|
Recent
Documents
|
Additional Phase IC Sampling Letter
Download
|
04/14/2008 |
de maximis, inc |
US EPA |
3.7 MB |
EPA Seeks Public Comment on Proposal
to Demolish Site Buildings
Download
|
04/2008 |
EPA Region I |
|
2.9 MB |
EPA "Time Critical Removal Action"
Press Release
Download
|
01/10/2008 |
EPA Region I |
|
26 KB |
EE/CA Disposition of Structures and
Contents
Download
|
02/18/08 |
de maximis, inc |
|
14.3 MB |
Revised Phase IC Work Plan
Download
|
05/07/07 |
de maximis, inc |
US EPA |
27.9 MB |
Phase 1B Work Plan
Download
|
11/14/05 |
de maximis, inc |
US EPA |
5.4 MB |
|
RI Workplans Final 4/15/05 |
|
|
|
|
Community
Involvement Support
Plan
Download |
04/14/05 |
de maximis, inc |
|
14 MB |
|
Risk Assessment
Plan Download |
04/13/05 |
de maximis, inc |
|
3 MB |
Groundwater
Modeling Plan
Download |
04/13/05 |
de maximis, inc |
|
3 MB |
Project Summary
and Operations
Plan
Download |
04/13/05 |
de maximis, inc |
|
150 MB |
|
RI Workplans Final 9/29/04 |
|
|
|
|
Workplan
Modification Request
Download |
10/20/04 |
de maximis, inc |
|
10 MB |
|
Field Sampling
Plan
Download |
09/29/04 |
de maximis, inc |
|
52 MB |
Health and Safety
Plan
Download |
09/29/04 |
de maximis, inc |
|
14 MB |
Quality Assurance
Project Plan
Download |
09/29/04 |
de maximis, inc |
|
39 MB |
Site Management
Plan
Download |
9/27/04 |
de maximis, inc |
|
13 MB |
| February
2004 Semiannual Groundwater Sampling Results
Download |
05/06/04 |
GeoSyntec
Consultants |
de
maximis, inc. |
57 KB |
|
June 2004 Semiannual Groundwater Sampling Results Download |
08/30/04 |
GeoSyntec
Consultants |
de
maximis, inc. |
67 KB |
| Figures |
File Size |
|
Phase 1B Groundwater Results |
|
| Total
Uranium in Overburden Groundwater |
400 KB |
|
Total Uranium in Bedrock Groundwater |
500 KB |
| Cross
Section through Holding Basin Plume |
|
|
Presentations |
|
Slides From May 15, 2008 Public
Information Meeting |
12.8 MB |
|
Slides From the January 12, 2005
Meeting
|
10
MB |
|
|
|
|