Documents
Title | Categories | Update Date | Download |
---|---|---|---|
29Apr24 Amendment to 100% RD for SSS Phase 1 – Courtyard, Landfill, Sphagnum Bog, and Cooling Pond Design, Appendix A, Attachment A-2 1 176 downloads |
Sitewide Soils and Sediments | September 5, 2024 | Download |
17May24 Tech Memo Regarding Soil Pre-characterization – Bldg W and Courtyard Area 1 129 downloads |
Sitewide Soils and Sediments | September 5, 2024 | Download |
20Jun24 Letter Providing Approval of Soil Pre-Characterization Memo for Bldg E and Courtyard 1 141 downloads |
Sitewide Soils and Sediments | September 5, 2024 | Download |
NMI Final RDWP Implementation Plans 1 3007 downloads |
Bedrock Groundwater, Holding Basin, Remedial Design Work Plans, Sitewide Soils and Sediments | November 6, 2020 | Download |
NMI Final RDWP Appendix A Pre-Design Investigation Work Plans for Site-Wide Soils and Sediments 1 2098 downloads |
Remedial Design Work Plans, Sitewide Soils and Sediments | November 6, 2020 | Download |